construction industry award Options
The north elevation sat close to eighteen inches in the neighboring building. This created a challenge because the north exterior partition was required to carry a two-hour hearth ranking, which usually would require a shaft wall assembly to become developed within the building’s interior. Town of Beverly Hills essential this partition for being